According to your requirements, the industrial people can provide rapid mold (injection molding) within 2-3 weeks. Even complex parts can be machined by rapid tooling. We can provide engineering-grade thermoplastic hand boards and short-term injection molding in a short time, which can meet the demand of 500-20,000 plastic injection molding, and the molding pressure is 7-1600 tons.
Rapid tooling: soft steel (such as P20) and aluminum (such as 7075 T6 aviation grade aluminum), with lower cost, can reduce the cost by 15%-30% compared with hard steel tooling, and is lighter in weight. Through good temperature control and the ability to remove plastic parts at lower temperature, the deformation of products can be reduced.